Is Your Asset a Fit?

A smaller or challenged project can be worth discussing. We start with a high-level summary, then decide whether a deeper review makes sense.

Share a project summary

What We Look For

Size alone does not determine fit. We look for a credible path to:

  • Continued operation or a practical repair or repowering plan.
  • Ownership and project rights that can be transferred, with a plan for existing obligations.
  • Measurable benefit for underserved households or community-serving organizations.

We consider renewable generation and storage assets worldwide. Local rules and project economics shape what is possible in each location.

Two technicians working on a wind-turbine blade high above the ground
Wind-turbine blade inspection · Photo: Werner Slocum / NREL

Technology-specific review

What We Review by Technology

Each asset brings different operating and transfer questions. These are the issues we explore when a project advances beyond the first conversation.

Solar & Hybrids

Generation and equipment history, inverter or repowering needs, and site and interconnection rights.

Wind

Turbine service records and major-component condition, land and grid rights, and the cost of repair or retirement.

Hydropower

Licenses and water rights, equipment and civil works, dam safety where applicable, and environmental commitments.

Battery Storage

Usable capacity and system health, fire-safety and operating plans, dispatch rights, and replacement or end-of-life costs.

We also consider geothermal, bioenergy, marine, and other renewable assets on their own technical and community-benefit merits.

What to Share First

A few facts are enough for an initial conversation:

  • Location, technology, capacity, and current operating status.
  • Recent generation or dispatch history and known maintenance or repair needs, if available.
  • Owner, financing interests, material contracts, and site or interconnection rights.
  • Known safety, environmental, or end-of-life obligations.
  • Your proposed transfer structure and a possible community use.

Keep confidential documents out of the website form. If we continue, we agree on a secure way to exchange records.

Technician examining an existing solar array at Natural Bridges National Monument
PV maintenance at Natural Bridges · Photo: Andrew Kuhn / National Park Service

How We Decide

We assess condition, operating costs, contracts, permits, and obligations alongside the proposed community benefit. A transfer moves forward only when there is a workable plan for operators, insurance, reserves, and long-term ownership.

For projects that advance through technical diligence and document review, Balance Fund covers a fair market value assessment. Donors use their own advisers for tax treatment and any required substantiation. An initial inquiry is nonbinding.

See the review process Read the Developer FAQs
Powerplant supervisor discussing generating equipment with visitors inside Denison Powerplant
Inside Denison Powerplant · Photo: Southwestern Power Administration

Put the power of an asset to work

Give Your Asset a New Purpose

Tell us about your asset and the impact you hope it can make. We’ll explore whether there is a responsible path forward.

Discuss a project